Cara Menghitung CBR

>Hello Sohib EditorOnline, if you are in the civil engineering or road construction field, you must know about CBR. CBR or California Bearing Ratio is a test to measure the strength of soil or other materials used as subgrade for road construction. In this article, we will discuss how to calculate CBR in a detailed and comprehensive way.

1. What is CBR?

CBR is a test that measures the ability of soil or other materials to bear the pressure from traffic load. The test involves applying a load on a small sample of soil and measuring the amount of deformation that occurs. The result is then compared to a standard value to determine the CBR value. The CBR value ranges from 0 to 100, where 0 represents the weakest soil and 100 represents the strongest soil.

1.1. The Importance of CBR

CBR is an important parameter in road construction as it helps in designing the thickness of the pavement layers. The CBR value also determines the type of soil that can be used in road construction. The higher the CBR value, the better the soil quality and the more suitable it is for road construction.

1.2. Applications of CBR

The CBR test is widely used in the following applications:

  1. Design of flexible pavements
  2. Design of airport runways
  3. Design of embankments
  4. Selection of materials for subgrade and subbase

2. How to Perform CBR Test?

CBR test involves the following steps:

  1. Take a soil sample from the field
  2. Dry the soil sample and sieve it through a 19mm sieve
  3. Weigh around 4 kg of soil and place it in a mould with a diameter of 152mm and a height of 127mm
  4. Compact the soil in the mould with 56 blows of a hammer, each blow having a weight of 4.5 kg and falling from a height of 457mm
  5. Weigh the mould with the compacted soil and note down the weight
  6. Soak the sample in water for 96 hours
  7. Place the sample in a CBR apparatus and apply a load at a rate of 1.25mm/minute
  8. Measure the load and penetration for different values of penetration and note down the results
  9. Calculate the CBR value using the formula CBR = (P/Ps) x 100, where P is the load required to cause a penetration of 2.5mm and Ps is the load required to cause the same penetration in a standard sample of crushed stone

3. Factors Affecting CBR Value

The CBR value of soil is affected by a number of factors including:

  • Type of soil
  • Moisture content
  • Density
  • Compaction method
  • Size of the sample
  • Type of loading device used

3.1. The Effect of Moisture Content on CBR Value

Moisture content plays a crucial role in determining the CBR value of soil. As the moisture content increases, the CBR value decreases. This is because water acts as a lubricant and reduces the friction between soil particles, thus decreasing the soil strength.

TRENDING 🔥  Cara Menaikan Berat Badan Secara Alami

3.2. The Effect of Density on CBR Value

The CBR value of soil is also affected by the density of the soil. The higher the density, the higher the CBR value. This is because the soil particles are more tightly packed, providing greater resistance to the load.

3.3. The Effect of Compaction on CBR Value

The method of compaction also affects the CBR value of soil. A soil sample that is inadequately compacted will have a lower CBR value compared to a sample that is well-compacted. This is because the well-compacted sample has more tightly packed soil particles, providing greater resistance to the load.

3.4. The Effect of Sample Size on CBR Value

The size of the soil sample used for CBR testing also affects the CBR value. A smaller sample size may not be representative of the entire soil mass, leading to incorrect CBR values.

4. How to Calculate CBR Value?

To calculate the CBR value, we need to follow the following formula:

CBR = (P/Ps) x 100

Where:

  • P is the load required to cause a penetration of 2.5mm
  • Ps is the load required to cause the same penetration in a standard sample of crushed stone

4.1. Preparation of Graph

The CBR value can also be calculated by preparing a graph of load vs penetration, as shown below:

Penetration (mm) 2.54 5.08 7.62 10.16 12.70 15.24 20.32 25.40
Load (kg) Standard Tested Soil Standard Tested Soil Standard Tested Soil Standard Tested Soil Standard Tested Soil Standard Tested Soil Standard Tested Soil
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.5 1370 Load 1 2055 Load 2 3215 Load 3 4535 Load 4 5075 Load 5 5765 Load 6 7340 Load 7
5.0 2440 Load 8 3425 Load 9 5350 Load 10 9075 Load 11 10670 Load 12 12400 Load 13 14950 Load 14
7.5 3505 Load 15 4975 Load 16 7750 Load 17 13605 Load 18 15995 Load 19 19020 Load 20 – –
10.0 4535 Load 21 6570 Load 22 10205 Load 23 19250 Load 24 23390 Load 25 – – – –

From the table, we can prepare the following graph:

Cbr Graph
Cbr Graph Source Bing.com

The CBR value is then determined from the graph by dividing the load at 2.5mm penetration of the tested soil by the load at 2.5mm penetration of the standard crushed stone sample and multiplying the result by 100. For example, if the load at 2.5mm penetration of the tested soil is 3505 kg and the load at 2.5mm penetration of the standard crushed stone sample is 4535 kg, the CBR value is:

CBR = (3505/4535) x 100 = 77.19%

5. Conclusion

CBR is an important parameter in road construction and civil engineering. The CBR test helps in determining the soil strength and suitability for road construction. The CBR value is affected by a number of factors including soil type, moisture content, compaction method, density, sample size, and loading device. By following the steps mentioned in this article, you can easily calculate the CBR value.

FAQ

1. How is CBR test performed?

The CBR test is performed by taking a soil sample, drying it, compacting it in a mould, soaking it in water, and then applying a load at a rate of 1.25mm/minute. The load and penetration values are noted and used to calculate the CBR value.

2. What is the importance of CBR in road construction?

CBR is important in road construction as it helps in designing the thickness of the pavement layers. The CBR value also determines the type of soil that can be used in road construction.

TRENDING 🔥  Cara Buat Puding Lumut Santan

3. What factors affect the CBR value?

The CBR value of soil is affected by a number of factors including soil type, moisture content, compaction method, density, sample size, and loading device.

Cara Menghitung CBR